Shenzhen, China
100000PCS
L/C, T/T, D/P, Western Union, Paypal, Money Gram
JBDWJ0079
Rubber
Metal Recycling Machine, Metal Cutting Machine, Metal Straightening Machinery, Metal Spinning Machinery, Metal Processing Machinery Parts, Metal forging Machinery, Metal Engraving Machinery, Metal Drawing Machinery, Metal Coating Machinery, Metal Casting Machinery
100PCS
Urgent Order:3-5 Days
Urgent Sample:3-5 Days
Urgent Orders 10-15 Days
T/T, M/T, D/T
Shenzhen
Without Freight&Tax Included
Qiaoruixin
Box Packing
30*40*50cm
China
7201500010
Refund Policy
3 Years
New
CE, RoHS, GS, ISO9001
DIN, ASTM, GOST, GB, JIS, ANSI, BS
Customized
Product Specifications | |
Craft | Lost Wax Casting , Precision Casting , Investment casting , Dewaxing Casting , silica Sol Casting , Precision Die Casting , Sand Casting. |
Material | Stainless Steel(General SUS304,SUS316,1.4301),etc.,Stainless Iron(General 201,420,430),etc.,High/Middle/Low Garbon Steel(A3,Q235,45),etc.,Alloy Steel(General 20cr,20crme,20crnimo,40crmo,40crnimo,42cr,42crme,42crnimo)etc.,Brass(H59,H62,H75,H80),etc.,Red Copper,Bronze,White Copper and other materials,The above menu is for reference only, if you have special needs,please contact customer service staff. |
Process | Wax Injecting War repairing ,Tree Planting , Mucilage , dewaxing , investment , Shell Vibration , Polishing , etc... 48 Processes In TotaL. |
Post-processing | Ordinary Polishing , Mirror Polishing , Electrolytic Polishing , Brushed Finishing , Grinding , Heat Treatment , Finishing , Drilling and tapping , Plating,etc. |
Ordering Methods | We Can manufacture And Process According To Customer's Samples Or Dravings Designs;Meanwhile We Provide Some Ready Stock for Direct Order. |
Mold Lead Tine | Rush Order : 3-5 Davs . General Lead Time:7-10Days ( Peculiar Product Exception) |
Sample Lead Time | Urgent Sample : 3-5 days , General Lead Time : 5-7 Days ( Peculiar Product Exception ) |
Order Lead Time | Urgent Orders:10-15 Days , General Lead Time:15-20 Days ( Peculiar Product Exception ) |
Terms of Payment | The Mold wili Be made After 100% Payment Of The mold Fee , 50% Deposit Should Be Paid In Advance , The Balance Should Be Paid Before Shipment. |
Shipping Port | Shenzhen |
Tax & Freight | Price Quoted Without Freight&Tax included,For other requirements Please contact customer service staff |
Product Specifications | |
Craft | Lost Wax Casting , Precision Casting , Investment casting , Dewaxing Casting , silica Sol Casting , Precision Die Casting , Sand Casting. |
Material | Stainless Steel(General SUS304,SUS316,1.4301),etc.,Stainless Iron(General 201,420,430),etc.,High/Middle/Low Garbon Steel(A3,Q235,45),etc.,Alloy Steel(General 20cr,20crme,20crnimo,40crmo,40crnimo,42cr,42crme,42crnimo)etc.,Brass(H59,H62,H75,H80),etc.,Red Copper,Bronze,White Copper and other materials,The above menu is for reference only, if you have special needs,please contact customer service staff. |
Process | Wax Injecting War repairing ,Tree Planting , Mucilage , dewaxing , investment , Shell Vibration , Polishing , etc... 48 Processes In TotaL. |
Post-processing | Ordinary Polishing , Mirror Polishing , Electrolytic Polishing , Brushed Finishing , Grinding , Heat Treatment , Finishing , Drilling and tapping , Plating,etc. |
Ordering Methods | We Can manufacture And Process According To Customer's Samples Or Dravings Designs;Meanwhile We Provide Some Ready Stock for Direct Order. |
Mold Lead Tine | Rush Order : 3-5 Davs . General Lead Time:7-10Days ( Peculiar Product Exception) |
Sample Lead Time | Urgent Sample : 3-5 days , General Lead Time : 5-7 Days ( Peculiar Product Exception ) |
Order Lead Time | Urgent Orders:10-15 Days , General Lead Time:15-20 Days ( Peculiar Product Exception ) |
Terms of Payment | The Mold wili Be made After 100% Payment Of The mold Fee , 50% Deposit Should Be Paid In Advance , The Balance Should Be Paid Before Shipment. |
Shipping Port | Shenzhen |
Tax & Freight | Price Quoted Without Freight&Tax included,For other requirements Please contact customer service staff |