Availability: | |
---|---|
Quantity: | |
0000251
JINBIANDA
Shenzhen, China
1000 PCS
L/C, T/T, D/P, Western Union, Paypal, Money Gram
Product Specifications |
Mainly material | brass, bronze, copper,aluminum etc. |
Process | investment casting, lost wax casting, silica sol casting. water glass casting, precision casting, gravity casting, low pressure casting |
Casting tolerance | CT4-CT6 (GB/T 6414),CT7-CT9 (GB/T 6414) |
Certificate | TS16949,SGS, ISO, or as your requirement to do test by the third party |
Machining | tapping, milling, grinding, drilling, cnc machining |
Tolerance | as drawing requirement |
Surface treatment | polishing,mirror polishing, sandblasting, shot blasting, chrome plating, powder coating |
Heat treatment | quenching and tempering, annealing, normalizing |
Casting Roughness | Ra 1.6-Ra12.5 |
1) Checking the raw material after they reach our factory------- Incoming quality control ( IQC)
2) Checking the details before the production line operated
3) Have full inspection and routing inspection during mass production---In process quality control(IPQC)
4) Checking the goods after they are finished---- Final quality control(FQC)
5) Checking the goods after they are finished-----Outgoing quality control(OQC)
Applications:
Custom machine work finds its application in numerous sectors:
Benefits:
FAQ
1.Quotation: Normally, your inquiry can be quoted within 6 hours as long as we confirm your drawing (IGS, STEP, STL, PDF,
DWGetc)and information (Material, Tolerance, Surface Treatment and QTY).
2.NDA Signing: With us, your business and money will be safe. So, before cooperation, NDA is avaliable to you.
3.Sample Testing: To ensure mass production smoothly, sample need to be tested before production.If products no need moulds,sample can be made within 15 days, fastest 3 days. If need moulds, it normally takes 20-30 days to make moulds and samples.
4.Mass Order Production: During production, we can give you updates by pictures and video.
5.Assembly&Packaging: We can help you assemble the whole product if you need. Packaging assure to be 100% safe, because we always do packaging test.
6.QC System:
1).Checking the raw materials before production;
2).Strictly inspect the processing during production;
3).Testing the half-finished products before surface finishing;
4).Do inspection one by one before delivery. Inspection Report can be provided for u.
7.Shipping: by express (DHL, TNT, UPS, FEDEX etc), by air or by sea
8.After-sale Service: Once you recieve the goods, please open the packaging and check within 7 days. If there're quality problems with our mistakes, we'll arrange to remake or return money to you. We will do the best to meet your satisfaction!
Product Specifications |
Mainly material | brass, bronze, copper,aluminum etc. |
Process | investment casting, lost wax casting, silica sol casting. water glass casting, precision casting, gravity casting, low pressure casting |
Casting tolerance | CT4-CT6 (GB/T 6414),CT7-CT9 (GB/T 6414) |
Certificate | TS16949,SGS, ISO, or as your requirement to do test by the third party |
Machining | tapping, milling, grinding, drilling, cnc machining |
Tolerance | as drawing requirement |
Surface treatment | polishing,mirror polishing, sandblasting, shot blasting, chrome plating, powder coating |
Heat treatment | quenching and tempering, annealing, normalizing |
Casting Roughness | Ra 1.6-Ra12.5 |
1) Checking the raw material after they reach our factory------- Incoming quality control ( IQC)
2) Checking the details before the production line operated
3) Have full inspection and routing inspection during mass production---In process quality control(IPQC)
4) Checking the goods after they are finished---- Final quality control(FQC)
5) Checking the goods after they are finished-----Outgoing quality control(OQC)
Applications:
Custom machine work finds its application in numerous sectors:
Benefits:
FAQ
1.Quotation: Normally, your inquiry can be quoted within 6 hours as long as we confirm your drawing (IGS, STEP, STL, PDF,
DWGetc)and information (Material, Tolerance, Surface Treatment and QTY).
2.NDA Signing: With us, your business and money will be safe. So, before cooperation, NDA is avaliable to you.
3.Sample Testing: To ensure mass production smoothly, sample need to be tested before production.If products no need moulds,sample can be made within 15 days, fastest 3 days. If need moulds, it normally takes 20-30 days to make moulds and samples.
4.Mass Order Production: During production, we can give you updates by pictures and video.
5.Assembly&Packaging: We can help you assemble the whole product if you need. Packaging assure to be 100% safe, because we always do packaging test.
6.QC System:
1).Checking the raw materials before production;
2).Strictly inspect the processing during production;
3).Testing the half-finished products before surface finishing;
4).Do inspection one by one before delivery. Inspection Report can be provided for u.
7.Shipping: by express (DHL, TNT, UPS, FEDEX etc), by air or by sea
8.After-sale Service: Once you recieve the goods, please open the packaging and check within 7 days. If there're quality problems with our mistakes, we'll arrange to remake or return money to you. We will do the best to meet your satisfaction!