Availability: | |
---|---|
Quantity: | |
0000273
JINBIANDA
Shenzhen, China
100000PCS
L/C, T/T, D/P, Western Union, Paypal, Money Gram
Priced competitively, the gear offers tiered pricing based on order quantity: US$1.80 per piece for 100-499 pieces, US$1.70 for 500-999 pieces, and US$1.60 for 1,000-1,499 pieces. For orders exceeding 1,500 pieces, the price drops to US$1.60 per piece, ensuring cost savings for bulk purchases. With a minimum order quantity (MOQ) of 100 PCS and a production capacity of 100,000 PCS annually, we can accommodate both small and large-scale demands efficiently.
Parameter | Details |
---|---|
Model NO | JBD1 |
Casting Method | Sand Casting |
Casting Form Material | Metal |
Casting Metal | Cast Steel |
Casting Form Usage Count | Semi-permanent |
Surface Treatment | Sand Blast |
Surface Roughness | Ra0.1 |
Coating | Diatomite powder |
Machining Tolerance | ±0.02mm |
Standard | GB |
Certification | CE, RoHS, ISO 9001:2000, ISO 9001:2008 |
Sample Lead Time | Urgent Order: 3-5 Days; General: 5-7 Days (exceptions for unique products) |
Mold Lead Time | Urgent: 3-5 Days; General: 7-10 Days (exceptions for unique products) |
Order Lead Time | Urgent Orders: 10-15 Days; General: 15-20 Days (exceptions for unique products) |
Terms of Payment | 100% payment for mold fee before production; 50% deposit in advance, balance before shipment |
Shipping Port | Shenzhen, China |
Tax & Freight | Not included in quoted price |
Transport Package | Box Packing |
Specification | 304050cm |
Origin | China |
HS Code | 7201500010 |
The production process encompasses 48 meticulous steps, from wax injecting and tree planting to shell vibration and polishing, ensuring every gear meets strict dimensional and performance standards. Post-processing options include Ordinary Polishing, Mirror Polishing, Electrolytic Polishing, Brushed Finishing, Heat Treatment, and Plating, allowing us to customize the surface finish to match your application needs.
Our commitment to flexibility extends to lead times. Urgent samples can be delivered in 3-5 days, while standard samples take 5-7 days. For bulk orders, urgent production runs are completed in 10-15 days, with standard lead times of 15-20 days—ideal for time-sensitive projects.
Priced competitively, the gear offers tiered pricing based on order quantity: US$1.80 per piece for 100-499 pieces, US$1.70 for 500-999 pieces, and US$1.60 for 1,000-1,499 pieces. For orders exceeding 1,500 pieces, the price drops to US$1.60 per piece, ensuring cost savings for bulk purchases. With a minimum order quantity (MOQ) of 100 PCS and a production capacity of 100,000 PCS annually, we can accommodate both small and large-scale demands efficiently.
Parameter | Details |
---|---|
Model NO | JBD1 |
Casting Method | Sand Casting |
Casting Form Material | Metal |
Casting Metal | Cast Steel |
Casting Form Usage Count | Semi-permanent |
Surface Treatment | Sand Blast |
Surface Roughness | Ra0.1 |
Coating | Diatomite powder |
Machining Tolerance | ±0.02mm |
Standard | GB |
Certification | CE, RoHS, ISO 9001:2000, ISO 9001:2008 |
Sample Lead Time | Urgent Order: 3-5 Days; General: 5-7 Days (exceptions for unique products) |
Mold Lead Time | Urgent: 3-5 Days; General: 7-10 Days (exceptions for unique products) |
Order Lead Time | Urgent Orders: 10-15 Days; General: 15-20 Days (exceptions for unique products) |
Terms of Payment | 100% payment for mold fee before production; 50% deposit in advance, balance before shipment |
Shipping Port | Shenzhen, China |
Tax & Freight | Not included in quoted price |
Transport Package | Box Packing |
Specification | 304050cm |
Origin | China |
HS Code | 7201500010 |
The production process encompasses 48 meticulous steps, from wax injecting and tree planting to shell vibration and polishing, ensuring every gear meets strict dimensional and performance standards. Post-processing options include Ordinary Polishing, Mirror Polishing, Electrolytic Polishing, Brushed Finishing, Heat Treatment, and Plating, allowing us to customize the surface finish to match your application needs.
Our commitment to flexibility extends to lead times. Urgent samples can be delivered in 3-5 days, while standard samples take 5-7 days. For bulk orders, urgent production runs are completed in 10-15 days, with standard lead times of 15-20 days—ideal for time-sensitive projects.